Primelectric backs resilient power supply deals at PHILRECA 2026

PHI chief operating officer Richard Nethercott
By Francis Allan L. Angelo
CEBU CITY — Primelectric Holdings Inc. (PHI) pushed for resilient power supply agreements amid an unpredictable energy market during a recent gathering of electric cooperatives at the Waterfront Cebu Hotel.
PHI participated in the Philippine Rural Electric Cooperatives Association (PHILRECA) event, which brought together industry leaders and stakeholders to discuss key challenges and opportunities in the Philippine power sector.
Lawyer Richard Nethercott, PHI chief operating officer, represented the company as a panelist in the PHILRECA Fireside Chat.
The discussion tackled the topic “Powering Through the Storm: Resilience of Power Supply Agreements in an Unpredictable Energy Market.”
Nethercott advocated for power supply agreements (PSAs) as a strategic mechanism for ensuring energy security, price stability, and supply reliability amid an increasingly volatile energy market.
PSAs are contractual arrangements between power suppliers and distribution utilities, including electric cooperatives, that establish the terms, pricing, volume, and duration of electricity supply.
According to PHI, well-structured PSAs can help mitigate exposure to market price volatility.
The company said such agreements can also help manage financial and operational risks.
PSAs can likewise provide greater predictability in electricity costs, ultimately benefiting consumers, it added.
Nethercott underscored the value of resilient and well-structured PSAs in enabling electric cooperatives to navigate uncertainties while balancing affordability, reliability, and long-term energy security.
The issue has drawn government attention, with the country’s energy chief in October urging electric cooperatives and other distribution utilities to examine their power procurement portfolios, particularly their exposure to the Wholesale Electricity Spot Market (WESM).
Nethercott previously served as president and chief executive officer of the Independent Electricity Market Operator of the Philippines, which operates the WESM.
PHILRECA held its 47th Annual General Membership Assembly and National Convention in Cebu City alongside the Rural Electrification Expo 2026, which was scheduled for Nov. 24 to 26.
Through its participation, PHI reaffirmed its commitment to strengthening industry collaboration and advancing a resilient, reliable, and sustainable power sector in the Philippines.
PHI is the holding company of MORE Electric and Power Corp. (MORE Power), Negros Electric and Power Corp. (Negros Power), and Bohol Light Co. Inc. (Bohol Light).
MORE Power distributes electricity in Iloilo City.
Negros Power, a joint venture between PHI and the Central Negros Electric Cooperative, has operated the Central Negros distribution network since August 2024.
PHI acquired majority control of Tagbilaran City-based Bohol Light in late 2024.
Comments (0)
LEAVE A REPLY
No comments yet
Be the first to share your thoughts!
Related Articles

G2G ARRANGEMENT: NIA, MIWD tap Jalaur for Metro Iloilo water supply
ILOILO CITY — The National Irrigation Administration and the Metro Iloilo Water District are working to develop the bulk water component of the Jalaur River Multi-Purpose Project Stage II, Iloilo’s biggest irrigation development project. The government-to-government arrangement aims to maximize the resources of both agencies in developing the component’s infrastructure, policy, financial,

Metro Pacific Water: Resilience in Every Drop
El Niño tests more than the amount of water available in reservoirs, rivers and aquifers. It tests whether water systems can endure prolonged dry conditions and keep water flowing reliably to communities as supplies come under pressure. For Metro Pacific Water (MPW), a subsidiary of Metro Pacific Investments Corp. (MPIC), resilience means preparing before households

Sunset Boulevard esplanade plan puts 445 mangroves on the line
ILOILO CITY — A proposed esplanade in Barangay Sooc, Arevalo District, could directly affect about 445 mangroves, prompting the City Environment and Natural Resources Office (CENRO) to oppose the project and call for further review. The esplanade is part of the Iloilo River North Bank Road project. In an inspection and
