local
‘ECONOMIC INFRA’: Think tank proposes PHP 2.65-B Calle Real revitalization plan
The Institute of Contemporary Economics has proposed a staged revitalization of Calle Real that it estimates could reach PHP 2.65 billion over the long term, beginning with a smaller demonstration corridor costing PHP 50 million to PHP 60 million. The proposal, dated June 23 and prepared for City technical review






















