Metro Pacific Water: Resilience in Every Drop

El Niño tests more than the amount of water available in reservoirs, rivers and aquifers. It tests whether water systems can endure prolonged dry conditions and keep water flowing reliably to communities as supplies come under pressure.
For Metro Pacific Water (MPW), a subsidiary of Metro Pacific Investments Corp. (MPIC), resilience means preparing before households feel the effects of water scarcity.
Now marking its 15th year, MPW serves approximately 221,000 households across Iloilo, Dumaguete and San Jose del Monte, Bulacan. Its El Niño preparations form part of a broader PHP 23,000,000,000 investment program over the next five years covering new water sources, treatment and distribution infrastructure, network rehabilitation and non-revenue water reduction.
“Water security is economic security,” said MPW President and CEO Andrew B. Pangilinan, underscoring the need to build infrastructure that communities can depend on for the next generation.
That resilience strategy is taking different forms in MPW’s service areas.
In Iloilo, Metro Pacific Iloilo Water (MPIW) is targeting up to 25 million liters per day (MLD) in additional supply and recovered water. Measures include 5 MLD from proposed modular desalination facilities, around 10 MLD through pipe replacement and non-revenue water reduction, and up to another 10 MLD from additional bulk water supplies, rehabilitation of existing wells and other sources.
To strengthen operational readiness, MPIW has 20 water tankers available and 16 more for deployment if needed, for a total of 36. Its preparations also include nine refilling stations and 24/7 supply monitoring, leak detection and repair.
Beyond these immediate measures, MPW is pursuing longer-term projects to diversify Iloilo’s water supply, including a 66.5-MLD desalination facility and the proposed 86-MLD Jalaur Water Treatment Project.
In Dumaguete, Metro Dumaguete Water (MDW) is protecting and expanding its groundwater supply. MDW operates 22 deep wells and is preparing to build its 23rd pumping station, which is expected to add another 3 MLD when it begins operating in 2027. Monitoring continues to show healthy groundwater levels, and the utility is strengthening its system ahead of prolonged dry conditions.
MDW is also upgrading pipelines, protecting the watershed in Barangay Lunga, Valencia, and promoting responsible household water use to help preserve groundwater availability.
In San Jose del Monte, where MPW operates on an interim basis through Metro Pacific Bulacan Water (MPBW), the focus is on rehabilitating an already stressed system while preparing for additional pressure from El Niño.
MPBW has reactivated three deep wells that added 1.5 MLD while continuing to rehabilitate pumping stations, repair leaks and reduce non-revenue water. It is also advancing the 3.4-kilometer Tanawin-to-Igay pipeline, which can transfer an additional 15 MLD of treated water and benefit around 15,000 households once operational.
Across these communities, building water resilience starts before faucets run dry.
It requires investing early, diversifying sources, recovering every possible liter and building systems that can adapt to increasingly difficult climate conditions.
For MPW, preparing for El Niño means building water systems that can withstand the next dry season and serve communities reliably for decades to come. (Advertorial)
Comments (0)
LEAVE A REPLY
No comments yet
Be the first to share your thoughts!
Related Articles

G2G ARRANGEMENT: NIA, MIWD tap Jalaur for Metro Iloilo water supply
ILOILO CITY — The National Irrigation Administration and the Metro Iloilo Water District are working to develop the bulk water component of the Jalaur River Multi-Purpose Project Stage II, Iloilo’s biggest irrigation development project. The government-to-government arrangement aims to maximize the resources of both agencies in developing the component’s infrastructure, policy, financial,

Primelectric backs resilient power supply deals at PHILRECA 2026
CEBU CITY — Primelectric Holdings Inc. (PHI) pushed for resilient power supply agreements amid an unpredictable energy market during a recent gathering of electric cooperatives at the Waterfront Cebu Hotel. PHI participated in the Philippine Rural Electric Cooperatives Association (PHILRECA) event, which brought together industry leaders and stakeholders to discuss

Sunset Boulevard esplanade plan puts 445 mangroves on the line
ILOILO CITY — A proposed esplanade in Barangay Sooc, Arevalo District, could directly affect about 445 mangroves, prompting the City Environment and Natural Resources Office (CENRO) to oppose the project and call for further review. The esplanade is part of the Iloilo River North Bank Road project. In an inspection and
