CCC, DOE team up towards shift to cleaner energy
The Climate Change Commission (CCC) and the Department of Energy (DOE) are partnering towards promoting and mainstreaming the use of hybrid and electric vehicles in pursuit of a low-carbon, sustainable, and climate-resilient development in the country. A plug-in hybrid electric vehicle (PHEV) was turned over to CCC by DOE last May 30 in a ceremony

By Staff Writer

The Climate Change Commission (CCC) and the Department of Energy (DOE) are partnering towards promoting and mainstreaming the use of hybrid and electric vehicles in pursuit of a low-carbon, sustainable, and climate-resilient development in the country.
A plug-in hybrid electric vehicle (PHEV) was turned over to CCC by DOE last May 30 in a ceremony led by DOE Secretary Alfonso G. Cusi and CCC Secretary Robert E.A. Borje at the DOE Office in Bonifacio Global City.
The transfer is in line with DOE’s “Alternative Fuels Program for Transportation and Other Purposes,” which promotes the use of cleaner alternative fuels and energy technologies for transportation.
The initiative is timely, especially with the recent enactment of Republic Act 11697, otherwise known as the Electric Vehicle Industry Development Act (EVIDA), which provides for a national policy framework to develop the electric vehicle industry in the Philippines.
The endeavor is one step towards reducing the transportation sector’s direct dependence on oil and gasoline, especially amidst rising fuel prices affecting consumers. It is also a move towards reducing air pollution levels, as it aligns with the climate change mitigation actions being articulated by the Commission.
CCC Secretary Borje expressed gratitude to the DOE and reaffirmed the CCC’s commitment to working with DOE and other national government agencies on sustainable energy and transport initiatives, and other mutually beneficial initiatives.
Article Information
Comments (0)
LEAVE A REPLY
No comments yet
Be the first to share your thoughts!
Related Articles

PHP6.5-B BUDGET SOUGHT: Panay dam project could start before 2028
The National Irrigation Administration in Western Visayas (NIA-6) is pushing for a PHP6.5 billion allocation in 2027 to start major civil works for the Panay River Basin Integrated Development Project (PRBIDP) in Tapaz, Capiz, before 2028, as detailed engineering design (DED) and feasibility study (FS) activities near completion. NIA-6 Regional Manager


