BM Del Rosario seeks probe into Capiz flooding
ROXAS CITY, Capiz – Sangguniang Panlalawigan member Fulgencio “Pepe” Del Rosario of Capiz’s 1st District has called for an investigation into the province’s drainage and flood control projects following the unprecedented flooding on October 18, 2025. In a privilege speech during Monday’s regular session, Del Rosario noted that it was not

By Felipe V. Celino

By Felipe V. Celino
ROXAS CITY, Capiz – Sangguniang Panlalawigan member Fulgencio “Pepe” Del Rosario of Capiz’s 1st District has called for an investigation into the province’s drainage and flood control projects following the unprecedented flooding on October 18, 2025.
In a privilege speech during Monday’s regular session, Del Rosario noted that it was not the first time such widespread flooding occurred after a heavy downpour.
He said that if concerned agencies address the issue seriously, improvements in drainage systems and flood control projects could prevent future flooding in low-lying areas.
He also emphasized the need to establish permanent evacuation centers rather than relying on school classrooms, malls, and churches to shelter evacuees.
“The recent flooding should be a wake-up call to all local government units and other government agencies mandated with disaster preparedness,” he said.
Del Rosario urged the provincial government of Capiz, Roxas City, and the affected municipalities to initiate an immediate investigation into flood control and drainage infrastructure.
However, he stressed that efforts should begin with desiltation, rehabilitation, and construction of drainage systems, along with strengthening the early warning capabilities of disaster offices across the province.
He also called on the Committees on Infrastructure and Agriculture to investigate the root causes of the flooding and craft sustainable solutions to prevent its recurrence.
Article Information
Comments (0)
LEAVE A REPLY
No comments yet
Be the first to share your thoughts!
Related Articles

PHP6.5-B BUDGET SOUGHT: Panay dam project could start before 2028
The National Irrigation Administration in Western Visayas (NIA-6) is pushing for a PHP6.5 billion allocation in 2027 to start major civil works for the Panay River Basin Integrated Development Project (PRBIDP) in Tapaz, Capiz, before 2028, as detailed engineering design (DED) and feasibility study (FS) activities near completion. NIA-6 Regional Manager


