No suspects yet in Arevalo mangrove murder
By Jennifer P. Rendon
By Jennifer P. Rendon
Police investigators have yet to identify a person or persons of interest in the murder of a 40-year-old man whose body was found near a mangrove plantation at Project 5, Barangay Sooc, Arevalo, Iloilo City.
Capt. Michael Tuburan of Iloilo City Police Station 6 said investigators are still reviewing closed-circuit television (CCTV) footage from cameras in areas leading to Sooc village.
So far, one CCTV camera captured the victim, Aurelio Diaz Jr., passing by Arevalo plaza accompanied by an unidentified man.
Tuburan said police have yet to speak with the victim’s family regarding their claim that he was lured into a trap by a group.
He added that the family is still making funeral arrangements for their slain kin.
Diaz was a resident of Janiuay, Iloilo, but had been staying at his sister’s house in Barangay Mali-ao, Pavia, Iloilo, following his estrangement from his wife.
He allegedly left home at around 7 p.m. on Feb. 18.
When his sister saw reports that a male body had been found, she tried to contact Diaz but could not reach him.
She and other family members went to Iloilo City Police Station 6 to confirm the identity of the slain man.
Tuburan said the victim’s motorcycle and a bag containing his wallet and mobile phone are also missing.
A crab fisherman discovered Diaz’s body around 8 a.m. Thursday while on his way to a nearby creek.
The victim sustained wounds on his head and body, and was likely struck with a hard object.
A blood-stained tree branch was found near the body, along with a pair of slippers underneath a monkeypod tree.
Blood droplets were also found approximately 10 meters from where the body was discovered.
Comments (0)
LEAVE A REPLY
No comments yet
Be the first to share your thoughts!
Related Articles

PGN Bridge cost climbs to PHP 331 billion
The estimated cost of the Panay-Guimaras-Negros (PGN) Island Bridges Project has increased to PHP 331.59 billion, primarily because of changes in the bridge design, foundation requirements and structural specifications, according to the Department of Public Works and Highways (DPWH). Engr. Antonio Erwin Aranaz, project manager of the inter-island bridge project, said


