MPIW INAUGURATES 1-MLD WATER TREATMENT FACILITY TO STRENGTHEN ILOILO CITY’S WATER SUPPLY
The facility converts salty groundwater into drinking water, adding up to 1 million liters a day to the city’s supply and potentially benefiting about 1,000 households. It is the first of five planned facilities aimed at strengthening water security amid El Niño.

ILOILO CITY, Philippines – Metro Pacific Iloilo Water (MPIW) has inaugurated a seawater reverse osmosis (SWRO) water treatment facility with a capacity of 1 million liters per day (MLD) in Prime Estates Subdivision, Barangay Nabitasan, La Paz, Iloilo City.
The facility uses seawater reverse osmosis to remove salt and other impurities from groundwater, making it safe to drink. With a capacity of up to 1 million liters of potable water a day, the facility is expected to benefit about 1,000 households in Barangay Nabitasan, Barangay Bantud and Magsaysay Village, as well as potentially serving other nearby communities.
The project is part of ongoing investments by Metro Pacific Water (MPW) and MPIW in alternative water sources to increase supply, improve service reliability and help maintain access to drinking water during prolonged dry periods, including those associated with El Niño.
STRENGTHENING WATER SUPPLY AMID EL NIÑO
As dry conditions put pressure on conventional water sources, MPW and MPIW are investing in alternative sources to help maintain a dependable supply of potable water for their customers.
The facility draws water from a 52-meter-deep well. Surface water sources are more directly affected by reduced rainfall, and the well gives the facility another way to sustain water production during dry periods.
“Our priority is straightforward: increase the water supply and improve delivery to our customers. This facility contributes to that goal, alongside our ongoing pipe replacement and other supply improvement projects,” said Angelo David Berba, MPIW’s chief operating officer.
Iloilo City Mayor Raisa Treñas also highlighted the importance of diversifying the city’s water sources. “Through the desalination plant, together with other water supply projects, we are strengthening and diversifying our water sources so that Iloilo City will be better prepared, especially during periods of drought.”
She also cited MPIW’s investments under its 2026–2027 Water Supply Augmentation Program, including pipe replacement and water recovery projects that she said could recover about 10 MLD.
TURNING SALTY GROUNDWATER INTO POTABLE WATER
The facility uses reverse osmosis, a treatment process that removes dissolved salts and other impurities through specialized filters called membranes.
Groundwater from the well passes through prefilters that remove dirt and other particles. Pumps then push the water through the membranes under high pressure, separating fresh water from dissolved salts.
The water undergoes final treatment and disinfection to meet the Philippine National Standards for Drinking Water before MPIW distributes it through its existing pipeline network. The facility handles the concentrated saltwater left over from treatment through its designated disposal system.
The modular equipment makes maintenance easier and allows for future expansion.
STRENGTHENING WATER SECURITY THROUGH CONTINUED INVESTMENTS
MPW and MPIW are leading the project, with Metro Pacific Water Solutions serving as the contractor and Hitachi supplying the treatment equipment. MPW supplies the treated water in bulk to MPIW, which distributes it through its existing network.
At the inauguration, Metro Iloilo Water District General Manager Alfredo Tayo III highlighted the facility’s potential to supply more water to households, businesses and schools in the areas it serves.
“Every single day, this plant can produce up to 1 million liters of clean water, which will enable MPIW to bring water to your homes, your stores, and the schools right here in Barangay Nabitasan, Barangay Bantud, and even Magsaysay Village. A project like this will only succeed when everyone works together,” Tayo said.
The facility is the first of five planned modular water treatment facilities across Iloilo City, each with a target capacity of 1 MLD, for a combined 5 MLD. Permitting and right-of-way work are underway for two proposed sites near Ateneo de Iloilo and along R. Mapa Street, with construction expected to begin around February 2027.
Long-term projects to improve water supply and reduce losses include the HS Jaro Total Pipe Replacement Project and the development of additional groundwater sources in Cabatuan and Santa Barbara.
Pipeline replacement projects are expected to recover about 6 MLD by the end of 2026, with a target of 10 MLD by 2027. The new groundwater sources are expected to contribute another 8 to 10 MLD.
With the planned modular treatment facilities expected to provide 5 MLD, the projects could add about 23 to 25 MLD in new supply and recovered water, helping Iloilo City meet growing demand.
“Water security requires a sustained and coordinated effort. Through investments in alternative water sources, pipeline improvements, and new infrastructure, we aim to increase water availability, improve service reliability, and provide more communities with access to safe and potable water,” Berba said.
Through these projects, MPIW continues to expand its water supply and improve service reliability in the communities it serves. (Press release)
Comments (0)
LEAVE A REPLY
No comments yet
Be the first to share your thoughts!
Related Articles

FROM ILOILO TO THE WORLD: Iloilo ube and bamboo could be headed to Europe
By Rjay Zuriaga Castor ILOILO CITY — The Iloilo Economic Development Foundation Inc. is exploring engineered bamboo and ube as potential Western Visayas exports to Europe under a new partnership with the European Chamber of Commerce of the Philippines. ILEDF and ECCP signed a three-year memorandum of agreement on Tuesday, Nov. 24, to promote trade,

Deferred charges now showing up in electricity bills
ILOILO CITY — Customers of MORE Electric and Power Corp. (MORE Power) are now paying in installments for generation costs that the company deferred earlier this year, as its average residential rate reached PHP 15.68 per kilowatt-hour (kWh) in November. Raphael “Rap” Dorilag, manager of the Energy Sourcing Department of

Iloilo City, IFFI allot PHP 40 million for Dinagyang 2027
ILOILO CITY — The Iloilo City government and the Iloilo Festivals Foundation Inc. (IFFI) are allocating a combined PHP 40 million for the 2027 Dinagyang Festival, with organizers promising a bigger and grander celebration of Ilonggo culture, faith, and religious traditions. The city government, IFFI,
