6 Pontevedra villages are drug-cleared
PONTEVEDRA, Capiz – Six barangays here have been declared by the Regional Oversight Committee as free of illegal drugs. These barangays, which were earlier identified as drug-affected, are Agbanog, Ameligan, San Pedro, Guba, Intongcan and Jolongajog. The declaration came after the barangays complied with the guidelines set by the Philippine Drug Enforcement Agency (PDEA). The
By Staff Writer
PONTEVEDRA, Capiz – Six barangays here have been declared by the Regional Oversight Committee as free of illegal drugs.
These barangays, which were earlier identified as drug-affected, are Agbanog, Ameligan, San Pedro, Guba, Intongcan and Jolongajog.
The declaration came after the barangays complied with the guidelines set by the Philippine Drug Enforcement Agency (PDEA).
The Regional Oversight Committee is composed of the PDEA, Department of Health, Philippine National Police and Department of the Interior and Local Government.
“This milestone was made possible because of the cooperation and support of the local government unit of Pontevedra led by Mayor Esteban Evan E. Contreras, Rural health Unit, our local DILG (Department of the Interior and Local Government), respective Barangay Drug Abuse Council, and our cops,” said Pontevedra police chief Christopher Candelario.
Meanwhile, seven more barangays in the town are poised to be declared drug-free after submitting the requirements.
Of the seven villages, five are unaffected and the two are drug-affected areas.
Pontevedra is composed of 26 barangays, 21 of which were identified as affected and five were un-affected.
Article Information
Comments (0)
LEAVE A REPLY
No comments yet
Be the first to share your thoughts!
Related Articles

PHP6.5-B BUDGET SOUGHT: Panay dam project could start before 2028
The National Irrigation Administration in Western Visayas (NIA-6) is pushing for a PHP6.5 billion allocation in 2027 to start major civil works for the Panay River Basin Integrated Development Project (PRBIDP) in Tapaz, Capiz, before 2028, as detailed engineering design (DED) and feasibility study (FS) activities near completion. NIA-6 Regional Manager


